Become a fan of absolutedsm.com on Facebook! Become a friend of absolutedsm.com on MySpace! Follow absolutedsm.com on Twitter!

MLK East-West Extension (East of the DSM River) Email
  • Details

  • Renderings

  • Construction Photos

  • Map

  • Links


Location: Across and east of the Des Moines River (from existing MLK Extension), connecting to SE 14th Street

Status: Under Construction

Developer: City of Des Moines

Cost: $51 Million

Category: Transportation and Infrastructure

Etc:

  • Major extension of the Martin Luther King, Jr. Parkway across the downtown Des Moines River, connecting with SE 14th Street
  • A four lane bridge with pedestrian enhancements will cross the downtown Des Moines Riverfront, opening up new land for development in east downtown and providing a much needed connecting "bypass" to downtown and points westward


Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!


May 2010

Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!
Click image to open!

June 2009

Click image to open!

April 2009

Click image to open!
Click image to open!
Click image to open!
Click image to open!

November 2008

Click image to open!
Click image to open!
Click image to open!


Last Updated on Monday, 31 May 2010 23:05