Location: Des Moines, Windsor
Heights, West Des Moines, Polk County
Developer:
Iowa Department of Transportation
Cost: $429 Million
Category: Transportation
Etc:
- I-235 is approximately14 miles long
- I-235 was designed in the fifties and completed in the sixties
- After reconstruction, I-235 will have 6 lanes (8 from Downtown to
63rd St) and auxiliary lanes
- In January of 2004, the Iowa DOT launched tripGuide, an
intelligent transportation system using cameras and sensors
- The I-235 corridor will be enhanced with color, plants, and
lighting
Status: Construction started in
2002, ends in 2007
Last Update: 8/23/06
Renderings:

Construction Photos:
August 2006 (pictures are generally in the order from Downtown to the SW mixmaster)






July 2006 (pictures are in order starting at the 31st St interchange eastbound to the NE Mixmaster)







September 2005

August 2004


March 2004

August 2003

March 2002

Precontruction (March 2002)


Website:
Interstate 235 Reconstruction
Forum Link: I-235 |